One of two emergency stop buttons for the new transmitter wired on Friday morning. These are needed for safety reasons before beginning the transmitter testing.

TWR had a Thank You/Farewell pizza/salad luncheon for the Waynesbury University team at noon. Ladies first! There were also 6 or more fellows.
After lunch, I began preparing for the big job of rerouting the 127/220 volt 200-amp 3 phase cable on Monday.

Inspected the 40-foot long cable tray that runs about 12 feet off the floor through four rooms for any obstruction. The cable is to run on this tray to its breaker panel.

Opened up a hole (on the left) in the tray for the wire to enter the room with the circuit breaker panel.
Tonight is our last night for staying at the Rienstra guest room. Tomorrow we are scheduled to move to the north duplex, which is a lot closer to the transmitter site..