We had a good trip, but it was very long… We left our house at 9:30 a.m. on Wednesday and arrived in Johannesburg at 9:15 p.m. on Thursday (3:15pm Indiana Time) We spent the night with our friends the Burnetts in a little apartment connected to their home. The next morning after breakfast we drove to the African Regional Offices in Johannesburg and had meetings. We left there around 1:30 in the afternoon to drive to Swaziland. It was interesting to just get into a strange car, drive on the wrong side of the road on unfamiliar roads, but we made it! We stopped at a place called Alzu for a break. We bought an iced mocha and the people who waited on us were a bit surprised that we wanted something icy. After all it is winter and cold, around 65 to 70 degrees!

I forgot to mention that the car, besides having everything turned around on the ‘wrong side’, has an anti-hijack button (that is so the car will be more difficult to steal). It is a hidden button that has to be pushed after the car is going, or the car will just stop running after about a minute whenever the car is started or a door has been opened.  The hard part is finding the hidden button and then remembering to push it. Fortunately, it gives a warning before it shuts down the car! Because everything is turned around, Larry was turning on the windshield wipers instead of the turn signal all the time. Then I was supposed to navigate and was totally confused which was left and right!! But we made it!

Back to our stop at Alzu. We saw some Cape Buffalo, zebra, and rhino, ostrich and eland. It was a fun stop, but a very busy one. School holidays in various places this time of year.

Well, we didn’t get lost, didn’t drive on the wrong side of the road, didn’t break the 75mph speed limit (the speed even on 2 lane roads. Actually went quite a bit slower), or have any unplanned or unwanted incidents. However, when we arrived at the boarder between South Africa and Swaziland, it was busy!!! We had a long queue (line) at the South African border, but elbowed our way through to a shorter line and got through in good time. Then there was the Swazi border!!  Parking was hard to find, but we waited for someone to back out and got a spot! The queue there was out the door and down the road about 100 ft. Then it wound around inside, but it was much better organized than the South African side. When we left, we had to wait for a break in the waiting vehicles behind us. So after about an hour at the borders we were on our way! It was dark by the time we got through so traveled the rest of the way in the dark. We were actually about 2 hours later than planned and were glad to eat and find a bed to sleep on.

Saturday, we slept until about 9:00am, but we did wake up around 3:00am and couldn’t sleep for awhile, so really didn’t sleep that well. We went to town with Steve and Lorraine Stavropoulos and did a little sight seeing and shopping. We saw the new mall in Manzini and bought fish and chips for lunch there. They were the good greasy fish and chips we remembered. We even got a grape pop/soda to drink.

These are the keys needed to move about the house

These are the keys needed just to move about the house. The larger remote has four buttons — to open the vehicle gate by the road, to open and close the garage door, to set the alarm, and a panic button. The latter works, but we’re not telling how we know!

In the afternoon we rested and tried to find places for our things. The house we are staying in has 4 bedrooms and a study, a beautiful fireplace, a laundry room, two complete bathrooms, nice kitchen, dining area, and living room. Also a screened in porch and a garage with an automatic door opener. It takes a device to turn off the alarm and 2 keys to get in the house. If we are driving, we have to push the button to open the big gate as well. Then there is the gate that has to be opened to go down the hall.. At first, I thought I might not go anywhere and hope that no one came to visit, because I might not be able to get out or in, but I think I am getting the hang of it now. Would have loved to have such a big house when we had 5 kids!

Today, Sunday, we went to the church we used to attend when we lived here. It was so nice to see old friends. The memories made me a little teary eyed. Such a warm welcome. We also met the new missionaries who arrived just this week and who Larry will be training. It was nice to see them there. We had a wonderful time singing. No congregation can harmonize and sing like those in Africa. Could actually hear the voices lifted in praise and hear the harmony!! Beautiful!

After church we had lunch with the Stavropouloses and sat and talked about old times and present. Was very enjoyable. Now that we have our computers hooked up and running, we can answer some emails.

We still get very tired at odd times, but today was better. The main problem this time was that the telephone that Larry has was programmed to receive messages of things happening in the office and site and it went of two times last night and it woke us up. We will turn it off tonight.

Tomorrow Larry goes to the site. I am not sure what I will be doing, but I know that when the new couple moves in, I will probably help them. Right now with the low staff, things are a bit slow, but know that God will provide plenty of opportunity for me to keep busy, help and encourage. He always opens doors if we keep our eyes on Him.

Arrived!

Just a quick note to say that we arrived on time in Johannesburg last night and stayed with the Burnetts.  Will be meeting at the Africa Regional Office this morning, then driving ourselves to Swaziland this afternoon, if we don’t crash from jetlag first!  Please pray as we are being thrown in at the start with driving on the left side of the road.

18 Nov 2010 Thursday

This morning the two cruise ships, Sea Princess and Noordam, both arrived just before 8 am.

After devotions, I reprogrammed the thermostat that will be used for the 6 ton unit at the site, then documented these new settings. Also sent an email to Joe Barker with attachments of both the installation and operation guides for this thermostat.

I then headed to the transmitter site via town, this being the shortest and fastest way. Tourists were all over the place. Guess that’s what happens when almost 5,000 people stop in a town about 5 blocks long!

Flood waters around Tower 3

At the site, I noticed the water on the property was a couple of inches higher from the rains over the past few days. It is the highest that it has been since we got here. For additional photos visit TWR Bonaire on Facebook or, if much later than when this was written, try clicking here.

With the programmable thermostat all prepared for installation, this project was quickly completed. Had to remove the old thermostat, drill and tap new holes in the box cover to which it is attached, and reconnect the wires. The air conditioner was then switched on. Not sure that it is functioning up to par. Cool air is coming out of the vents, but it seems to take an hour for the temperature to drop a couple of degrees.

When I headed out the door to pick up Virginia for lunch, the rain was pouring down with a blustery south wind. Driving through town, there were lots of drenched tourists making their way back to the ships. Only noticed one that seemed to be enjoying the situation and that person was wearing a swimsuit and flip-flops.

While picking Virginia up for lunch, I also gathered a few small parts that were needed for the site. [I suspect, most of these items are also at the site, but I already knew their location in the studio’s tech lab.] Originally, Virgina was planning to pick up lunch from the vendor who prepares Bonairean food for the ships, but, because of the heavy rain, we ordered sweet-and-sour chicken from China Nobo instead.

Brrr — it was cold as we headed to the site. Only 80 degrees and still raining hard. I turned the defroster on to clear the condensation off the inside of the windows. Since there is no heater on the car, only an air conditioner, Virginia had a towel wrapped over her to keep warm. One doesn’t think they would feel cold at 80 degrees. The posted weather says partly cloudy, but the clouds are staying put for awhile.

The water at the site was about an inch deeper than this morning. Shortly after getting there, Gaby Felix (Amado’s younger brother) came from Cargil, the salt company, to inform us that he was going to start the pump to lower the water in the perimeter ditch around their salt pan bordering our property. Hopefully, this should help lower the water level on TWR property.

My first afternoon project was to connect the front door switch and remove the motion sensor for that area. Because of the preparation yesterday, this only took a few minutes.

I then moved the motion sensor into a more strategic location. This required running two pairs of wires — one pair for power and one pair for the sensor switch. When asked for a masonry drill for mounting the sensor, Benny said to use a regular drill. I was amazed that it was still pretty sharp after drilling two holes through plaster into block. After connecting power to the sensor and wiring the sensor switch in series with the other sensors, it was ready to test. It functioned amazingly well, even triggering with motion outside a couple of door openings into that area. I don’t think it could have been installed in any better place.

Next, I began to search out a way to control the tower lights remotely. The tower lights are feed from a circuit breaker panel, which goes to an control box with a contactor inside. The contactor is closed using a photo cell mounted outside the building, or by a manual switch on the side of the control box to override the photo cell. From the contactor, the power goes to a second circuit breaker box that has four separate breakers — one for each tower.

I noticed that there were two small control cables coming into this area. One was traced to extra contacts on the contactor. This provides a switched signal to the Gentner for indicating that the lights are on. The second control cable goes to a circuit, with three current transformers attached, that provides an metering signal to the Gentner of the amperes currently used by the lights. This measurement can be used to determine if there a light bulbs that are no longer functioning.

I need to ask if the switched contact is really necessary, since the metering signal will be zero, if the lights are not on. If not needed, this pair of wires can be used to provide for the remote override of the photocell. If needed, I could run another cable, but this would take extra time.

I mounted a relay socket in the second breaker panel, next to the current sensing circuit, instead of in the control box, which lacks room for it. Tomorrow, I will try to wire it up.

With the transmitter successfully starting up for the evening, we decided to head for home. It was still raining some and the wind was now out of the north. The water was another inch or so higher, as we drove through it on the road out. Hopefully the Cargill pump will begin to make a difference soon.

Nearing town, we noticed that the Noordam ship was just leaving for Curacao. We also noticed the big engines were puffing smoke on the Sea Princes. Virginia decided soup would be good for supper on such a ‘cold’ evening, so we stopped at Warehouse Bonaire Supermarket. In the few minutes that it took to purchase the soup and head for home, the Sea Princess was a half mile or so from shore, also headed for Curacao.

Tomorrow will be a part day for working. The staff is planning a farewell breakfast first thing, then the Pelikaan School is having an open house in the afternoon. All TWR staff has been invited to that. Pelikaan School purchased TWR’s former activity building across the street from the studio/office. It has continued to grow, and they also used part of the office wing for school while expanding their building. The building is now completed, so they are having an open house.

Click here on Pelikaan School and see if you can find Rich West in the first photo.

48 hours from now, we should be flying between Atlanta and Chicago on our way home. Right now it is supposedly 79F here, but it feels cooler than that.

17 Nov 2010 Wednesday

Noticed today that all the piers are nearly empty of ships. Freewinds had left after being here for 3 days. Dona Luisa and Don Andreas, the ships that transport most of the goods between Bonaire and Curacao, are also gone. This is probably in preparation for the two cruise ships, Noordam and Sea Princess, that are due in tomorrow.

Before devotions this morning, I had a few minutes and looked into why Joe had stated that the power plugs on the large UPSs we not interchangeable. Discovered that the 60 amp receptacle of UPS(A) and it mating plug are mounted upside down compared to the other three places. The ‘hot’ wire was connected to the right blade in all cases, but, if the plug is upside down, it will find a ‘cold’ slot when plugged into the other receptacles and vice versa. When I emailed Joe to have my observation on record, he replied, “Sounds like a task we can put on your list for your next trip to Bonaire :).”

After devotions, with the encouragement of Rich West, I checked into the possibility of using a programmable thermostat control, from an unused room at the office complex, to ‘turn-off’ the site 6 ton air/co when no one is there. I wanted to make sure it was compatible before ‘borrowing’ it. After reviewing its installation manual on the internet, it looked like it would work.

After rounding up some tools, connectors and the thermostat, I headed to the site.

My first site project was to test the pager feature of the security system. After ‘erasing’ the ‘primary’ phone numbers, the ‘pager’ number was entered to ‘call’ my cell phone. After disconnecting the ‘sirens’, an alarm was purposely triggered and my cell phone was called — almost 4 minutes later! Another test was done and the time was about 8 minutes. It doesn’t look like this will work for use as the ‘first’ alert. I suspect the system is ‘attempting’ to contact the ‘primary’ phone numbers (even though they are erased) 16 times before beginning to contact the ‘pager’.

While installing a backup battery for the security system, I took a little too long, because the terminals of the old battery were different size spade connectors than the ‘new’ one. The system ‘beeped’ and displayed an error message of ‘battery voltage low’. In this case, the ‘pager’ number was called immediately!

I checked the ‘sensitivity’ settings of all the motion detectors and discovered that the two in the big rooms were set to least sensitivity. I changed them all to highest sensitivity and they seemed to work much better. I assume that when the manual states to set for least sensitivity for harsh environments, it is not referring to temperature range. If there are any false alarms, as a result of these changes, my assumptions will have been proven wrong!

Next, my focus was on the thermostat for the 6 ton site office air/co. I quickly discovered that there are only three wires with 24 volt AC control voltage. The thermostat must handle 0.74 amp to energize the air/co. The programmable thermostat will work, but, since only one side of the 24 volt supply comes to the thermostat, the batteries will need to be replaced yearly. [As an after thought — since this air/co will be off much more than it is on, would it be possible to provide power to the thermostat from the fan or compressor control line through a resistor to the C (common) terminal? The batteries would only need to supply power when the unit is actually running. Will have to think about this some more, but won’t implement it this week. Of course and easy to say, the best solution is to run a common (C) wire from the air/co to the thermostat.]

To complete the thermostat installation, new batteries are needed, holes drilled and tapped for mounting it, and a revised program entered. Decided to do some of this tomorrow at the office/studio where the user manual is stored on a computer. Hopefully there are also some new batteries there. Joe would like the thermostat to automatically set itself to 85F at 9:00 am (after getting tools to work outside), 2:00 pm (after lunch), 4:30 pm (after work) and 6:30 pm (after working late). The temperature can be manually lowered any time, but will automatically revert to 85F should the building become unoccupied. [This sounds kind of strange when most Americans think of setting the thermostat lower to save heating costs.]

I now began to install the wiring to install a door switch, instead of a motion sensor for monitoring the entry door. The motion detector will be moved to another location that should be protected. I drilled and tapped the metal door frame and door to mount the magnetic switch and magnet. The wiring was run above the ceiling in preparation for connecting it to the line currently going to the motion sensor. It was getting too close to quitting time to make the final changeover. Planning to do this tomorrow.

Before leaving the site, the primary phone numbers were reprogrammed into the security system. The ‘sirens’ were reconnected, then the system was ‘armed’.

This evening we went for a swim to ‘cool off’. The current temperature is 80F and ‘feels’ amazingly good!

Since we had our dinner at noon (chicken and rice), we cleaned up the peanut butter and jam jars to make sandwiches this evening. It was nice that they emptied at the same time. I will have to go without my PBJ sandwiches until we get home :-(! We also had bacobas (small sweet bananas).

No pictures in this entry, but should get to bed earlier tonight as a result.

16 Nov 2010 Tuesday

As Virginia and I headed to the office this morning, we noticed that the Dona Luisa was back at the dock after delivering containers to Curacao yesterday.

Today I again spent all day at the office/studio. I was studying up on a way to use the pager output on the security system to contact a cell phone and leave a text message. It appears the differences between the two protocols are too great to allow that to even happen. I also found out, from various user’s experiences documented on the internet, that the pager output may not even work to call about an alarm. We will make an attempt to test this out tomorrow. We had hoped to use this to avoid the ‘comm failure’ error that always occurs with the other method of ‘phoning’ an alarm.

On the way home for lunch, we went by Warehouse Bonaire Supermarket to get some milk, cereal and a couple more things to just tide us through til Saturday. They did not have milk (except for a big can of powdered milk) and had only the more expensive cereals. After lunch, we then went by Cultimara Supermarket, which tends to have slightly higher prices, to get what we needed.

A shipment of muffin fans had arrived this morning and Joe Barker asked me to install one in the amplifier assembly for the Intelsat satellite dish. This fan had a problem getting water into it and failing because of the high dish angle required closer to the equator. At higher latitudes in the U.S. the dish is tilted down more and the water runs off, but here it runs into the fan shroud.

When it failed they did not have the right size fan, so two smaller ones were installed instead. An extra shroud was built to help keep out water.

I had to remove both shrouds, remove the two fans, and install and connect power to the new fan. Fortunately the fan voltage is only 12 volts, so all this could be done with power on. When putting the shrouds back on, I added additional weather stripping on the original shroud and some silicon seal on the extra shroud to help keep out most rain water.

Joe asked me to look into the cost of an internet module for the security system and whether it would be useful. After quite a bit of research, I discovered this module is mainly a way to use the internet to contact the alarm monitoring center if phone lines are not available. It would also allow the user to program the system over the internet, but not allow the internet to directly report an alarm to the user. The cost for the additional equipment would approach $1,000, which is 4 or 5 times the cost of the basic system itself! Why am I getting the impression that this system is designed to give job security to the installers and monitoring services of these systems?!

We got home a little after 6pm and the sun was almost setting, so we decided to forego our evening swim. We did have a special treat later this evening — homemade Coca-Cola floats.